We had a bit of a hiatus between Days 5 & 6 and Days 7 & 8 of unroofing the garage because of this:


Who's to say no to a trip to the beach? The garage roof has been leaking for years, what's another week? We had plans to finish removing the last strip of roof on Sunday when we returned, but...it rained. All day. So it was Monday before the final unroofing was completed. That took more time than expected because one of our crew of 2 (me) came down with a cold and felt a little too wobbly to be on the roof.


Roofing supplies arrived on Monday also. The delivery truck didn't have equipment to place them on the roof, so that was up to us. We rented a ladder hoist. Which was fine, but it didn't come with instructions for putting it together, or using it, so it took a couple of trips into the house to check the internet to get it right and then we only figured out that it would dump the load at the top of the roof by accident. The hoist also had a partially stripped belt so it would only lift 2 shingles packages rather than the 400lbs it was rated for. The other problem is that one of us (me) isn't strong enough to be hefting squares of shingles. So that left it all to the man on the roof. Load the hoist, send 'em up, climb the ladder, place them on the roof, repeat.


It took all day Tuesday to get all of the shingles and roofing felt up on the roof and placed, but he did it. Direct quote, "Don't ever let me replace an entire roof again." Duly noted.

1 comment:

  1. Technically, it is wrong to delay the fix for another week. But a trip to the beach truly is tempting. ;D Just as long as you keep the holes covered securely, so in case it rains, you wouldn't have to bring the worries to your trip.